Using Integer Programming for Airport Service Planning in Staff Scheduling

From IFORS Developing Countries Online Resources
Revision as of 07:04, 18 April 2014 by Dcadmin (Talk | contribs)

Jump to: navigation, search

By W.H. Ip, Nick Chung and George Ho

Abstract

Reliability and safety in flight is extremely necessary and that depend on the adoption of proper maintenance system. Therefore, it is essential for aircraft maintenance companies to perform the manpower scheduling efficiently. One of the objectives of this paper is to provide an Integer Programming approach to determine the optimal solutions to aircraft maintenance planning and scheduling and hence the planning and scheduling processes can become more efficient and effective. Another objective is to develop a set of computational schedules for maintenance manpower to cover all scheduled flights. In this paper, a sequential methodology consisting of 3 stages is proposed. They are initial maintenance demand schedule, the maintenance pairing and the maintenance group(s) assignment. Since scheduling would split up into different stages, different mathematical techniques have been adopted to cater for their own problem characteristics. Microsoft Excel would be used. Results from the first stage and second stage would be inputted into integer programming model using Microsoft Excel Solver to find the optimal solution. Also, Microsoft Excel VBA is used for devising a scheduling system in order to reduce the manual process and provide a user friendly interface. For the results, all can be obtained optimal solution and the computation time is reasonable and acceptable. Besides, the comparison of the peak time and non-peak time is discussed.

Keywords: airport service, aircraft, manpower scheduling, maintenance.

Link to material: http://www.intechopen.com/journals/international_journal_of_engineering_business_management/using-integer-programming-for-airport-service-planning-in-staff-scheduling


<addhtml>

</addhtml>